RM新时代手机版下载

<delect id="zmmad"></delect><delect id="zmmad"><span id="zmmad"></span></delect>

    <meter id="zmmad"></meter>

    <del id="zmmad"><video id="zmmad"></video></del>

    <delect id="zmmad"></delect>
    <button id="zmmad"><meter id="zmmad"></meter></button>

  1. <ins id="zmmad"><track id="zmmad"><cite id="zmmad"></cite></track></ins>

  2. Email:915510982@qq.com

    Map 中文 English
    English

    Integrated high-tech enterprise

    Focusing on suppliers of automatic industrial equipment and system solutions

    Hotline:18902853808
    Product
    Large six axis robot arm

    Large six axis robot arm

    Hotline

    0755-29091833

    Details

    Contact Us
    Shenzhen Dinghua Kechuang Automation Co., Ltd
    Contact: Mr. Zhang
    Email:915510982@qq.com
    Mobile phone:18902853808
    Telephone:0755-29091833/29091822/29091633
    Fax:0755-29091622
    Address: 4th Floor, Building B, Building 6, Shengzuo Zhi Technology Industrial Park, North of Xinyu Road, Shajing Street, Bao'an District, Shenzhen
    Recommended Products
    Industry News
    Overall dimensions:
    20171019112728123562.jpg
    20171019112728576221.jpg
    Application case:
    20171019112918876165.jpg

    Equipment principle:

    Part One: Material Vehicle Section. Arrange the rotor in a matrix manner into the material tray, and then place the tray into the material cart. Each material cart can hold multiple layers of trays;

    Part 2: Elevating Platform Section. Push the material cart into the automatic lifting platform and position it. After receiving the signal, the material cart starts and automatically rises to the designated position

    Part Three: Tray Connection Platform. The material tray is transported to the transfer station through a cylinder and chain drive for positioning, making it convenient for the robot to pick up and place materials. When all the rotors in the material tray have dripped glue, it will exit the tray. At the same time, the tray filled with semi-finished products will be transported to the transfer station through a lifting platform; Part Four: Material Preparation Platform. When all the disc rotors are finished products after dispensing glue, the robot switches to the material preparation table, which can achieve material replacement without stopping and improve work efficiency; Part 5: Robots and Fixtures. The robot fixture has two workstations, one for taking out finished products and the other for placing semi-finished products on the matching dropper, which improves work efficiency;

    Part 6: The robot operates synchronously with the dropper, removing two finished motor rotors from the dropper within 20 seconds and simultaneously placing two semi-finished motor rotors into the dropper; Part 7: Control section. Including robot control system, teaching box, and non-standard application control part, responsible for all automation control, teaching, and communication with the dropper.



    weixin
    3427757449
    13424367510
    18902853808
    Copyright ? 2025 Shenzhen Dinghua Kechuang Automation Co., Ltd. All rights reservedGuangdong ICP No. 16111246
    RM新时代手机版下载
    <delect id="zmmad"></delect><delect id="zmmad"><span id="zmmad"></span></delect>

      <meter id="zmmad"></meter>

      <del id="zmmad"><video id="zmmad"></video></del>

      <delect id="zmmad"></delect>
      <button id="zmmad"><meter id="zmmad"></meter></button>

    1. <ins id="zmmad"><track id="zmmad"><cite id="zmmad"></cite></track></ins>

    2. <delect id="zmmad"></delect><delect id="zmmad"><span id="zmmad"></span></delect>

        <meter id="zmmad"></meter>

        <del id="zmmad"><video id="zmmad"></video></del>

        <delect id="zmmad"></delect>
        <button id="zmmad"><meter id="zmmad"></meter></button>

      1. <ins id="zmmad"><track id="zmmad"><cite id="zmmad"></cite></track></ins>

      2. RM新时代|首入球时间 新时代RM游戏app rm新时代正规吗 rm海淘网官网入口 新时代RM|国际平台 RM新时代正规网址|首入球时间 RM新时代专业团队|首入球时间 RM新时代APP官网网址 RM新时代平台网址 RM新时代APP官网网址